Project Overview

A pipe carrier and pipe supports designed to install various pipe segments for the Chimney Hollow Reservoir Spillway. 30,000 lb capacity with 4 inches of vertical adjustment in both directions


Scope of Supply

Kelley Engineered Equipment (KEE) designed and supplied a pipe carrier and supports for installing various pipe segments at the Chimney Hollow Reservoir Spillway. The system features a 30,000 lb capacity with 4 inches of vertical adjustment in both directions.

Matt and Tim were great to work with – our complex scope was handled with great solutions!

Kyle Dikeman Barnard Construction