Transmountain Expansion Project
Burnaby Pipe Installation System
Chimney Hollow Reservoir | Loveland, Colorado
A pipe carrier and pipe supports designed to install various pipe segments for the Chimney Hollow Reservoir Spillway. 30,000 lb capacity with 4 inches of vertical adjustment in both directions
Kelley Engineered Equipment (KEE) designed and supplied a pipe carrier and supports for installing various pipe segments at the Chimney Hollow Reservoir Spillway. The system features a 30,000 lb capacity with 4 inches of vertical adjustment in both directions.
Matt and Tim were great to work with – our complex scope was handled with great solutions!
Kyle Dikeman Barnard Construction