River Valve Outlet (RVOS) System Oroville Dam Diversion Tunnel
Valve Gantry
Northern California
Kiewit Infrastructure needed a gantry to pick up, transport, and accomplish fine positioning of two 159,000 LB, 11 FT tall valves.
The gantry was powered by an onboard HPU driving a hydraulic drive system on each of the 4 bogies. Max carrier speed was 5 FPM. The gantry utilized 3x 8 IN bore cylinders hung from a hydraulic XY sideshift table to lift the valve for transport. The gantry weighed 28,000 LB and was 15.8 FT tall.