Launch & Removal Systems

TBM Re-Launch System

Dragados/Judlau

Saddles on dollies and anchorage systems to facilitate loading, transportation and launching of 22’ diameter shielded TBM from one alignment to another

TBM Thrust Anchors

Dragados/Judlau

Struts with capacity for 50% of Full thrust for 22’ Diameter open TBM. Contingency plan for Y cavern re-launch

TBM Partial Disassembly Plan

Dragados/Judlau

Contingency plan for removing Double shield TBM through tunnel with ring beams. Includes custom engineered 240 ton capacity low profile dollies

TBM Backout Plan

Dragados/Judlau

Complete plan with detailed design of all material handling components for removing 22’ diameter open TBM from tunnel

TBM Launching Frame

Traylor/Skanska/Jay Dee

Conceptual design of 4000 ton capacity TBM launching system

TBM Thrust Ring

Traylor/Skanska/Jay Dee

Detailed design of thrust ring for TBM launch systems

Jacking Frame

DSI Underground

Preparation of detailed drawings for fabrication of 700,000 lb. structure which reacts 21,000 Kip TBM thrust

Jacking Frame – 42′ x 12,000 Kips

Dragados/Schiavone

Conceptual design of TBM jacking frame

Jacking Frame – 10′ TBM

SAK®

Preliminary design to determine budgetary cost for feasibility compared to other options

TBM Cradle

Kiewit/Shea

Final design and drawings for TBM launch cradle and procedure

Interested in a Project?

Unlock unparalleled expertise and innovative solutions for your next project by reaching out to Kelley Engineered Equipment today. Let our team empower your success with tailored engineering solutions and unparalleled dedication to your project’s needs.

Kelley Engineered Equipment

(531) 455-7466
info@keellc.com

Name(Required)
This field is for validation purposes and should be left unchanged.