← Equipment

Trailing Gear

TBM Rebuild

McNally/Kiewit

Teaming with Herrenknecht USA to provide engineering support for 12’ diameter TBM modifications. Detailed Design of the Following Systems:

  • Trailing Gear
  • Ventilation
  • Tow System

TBM Ground Support System

Robbins

Ground support system design for 2 each 10.2m diameter TBMs including:

  • Ring beam erector
  • Roof bolting system
  • Mesh Installation System
  • Material handling system

TBM Rebuild

JayDee/Dillon Fluid Power

Proposal for rebuild of existing Robbins hard rock machine

Electrical Work Decks

Traylor Frontier–Kemper

3 car system installed in between existing trailing gear cars provide access for permanent electrical system installation and provisions for delivery and storage of permanent materials

Trailing Gear

Robbins

Trailing gear design for 26’ diameter EPB machine on 1:6 decline

SELI TBM Burial Plan

Dragados/Judlau

Assistance with planning for retreiving trailing gear decks and grouting the TBM in now that mining is complete.

TBM Auxiliary Gripper System

Dragados/Judlau

Shoes on invert and arch anchor TBM while mining Y caverns

Interested in a Project?

Unlock unparalleled expertise and innovative solutions for your next project by reaching out to Kelley Engineered Equipment today. Let our team empower your success with tailored engineering solutions and unparalleled dedication to your project’s needs.

Kelley Engineered Equipment

(531) 455-7466
info@keellc.com

Name(Required)
This field is for validation purposes and should be left unchanged.